The impact

Weather permitting, North McDonough Street and the Candler and McDonough intersections at East Howard Avenue and College Avenue will be milled in preparation for final resurfacing starting on Monday, July 17. The work should take 2-3 days. This work is part of the North McDonough Streetscape Improvements and the Railroad Crossing Improvements at Candler and McDonough Streets.

Project details

The North McDonough Streetscape Improvements include reducing North McDonough to two vehicle lanes, providing for wider sidewalks, and installing a 2-way “cycle track” on the west side of the street, along with traditional streetscape improvements and on-street parking. The project also features significant “green infrastructure” improvements to improve storm water quality.

The Railroad Crossing Improvements will significantly improve accessibility and safety for pedestrians and bicyclists, further encouraging those who live in Winnona Park, the McDonough-Adams-Kings Highway community, and other neighborhoods south of the CSX rail corridor to walk and bike into downtown Decatur.

 The improvements will provide gentler slopes on the north side of both crossings resulting in an accessible path for persons in wheelchairs or those using strollers, and a much safer route for all located outside the railroad crossing gates. Presently, pedestrians and bicyclists have to share the roadway with vehicles at these crossings.

In addition to improvements at the crossings, there will now be new pedestrian crosswalks where none presently exist — on the east side of both intersections and just north of the Candler crossing connecting to the sidewalk along the old Depot property.

Finally, improved vehicular mobility is also a project priority. Both crossings will include new traffic signals on both sides which will allow protected left turns on all legs of the two crossings.

How to manage

North McDonough and the two intersections will remain open to two-way vehicle traffic. However, there will be temporary lane closures and minor delays during the work.

Streetscape milling image

To obtain updates on this and other construction projects in downtown Decatur, sign up for Extreme Makeover: Downtown Decatur Edition at decaturmakeover.com.

Read Full Post »

The City Commission has awarded the contract for construction of Phase V of the Downtown Decatur Streetscape Improvements to the low bidder, GS Construction of Lawrenceville. Construction is expected to start in February.

The project will provide new streetscape improvements in the following areas:

East Trinity Place:          

  • South side only between North McDonough Street and Church Street.
  • Both sides between Church Street and Decatur Fire Station No. 1.

Church Street:      

  • Both sides between East Howard Avenue and East Trinity Place.

The work includes new sidewalks, street trees, lighting and street furniture. When the project is near completion, both streets will be milled and resurfaced.

Depending on the weather, the project will take 9 – 12 months. While there will be some inconvenience throughout construction, access to businesses is to be maintained throughout the project, except for short periods when a sidewalk or driveway is being removed or replaced. The city will have an on-site project manager to answer questions, help with construction issues and provide information about the project.

We appreciate everyone’s patience in finally getting this project started and look forward to a productive 2015.

Phase V downtown Decatur streetscapes Feb2015

Read Full Post »

Starting tomorrow night at 10 p.m. (Tuesday, June 24) one lane of traffic on East Trinity Place between N McDonough St and Church St will be closed overnight so AT&T can install a new service. All work by AT&T will be done at night between the hours of 10 p.m. and 6 a.m. Two-way traffic will be maintained on the north side of the street while crews work on the south side of Trinity. Please use caution when traveling through this area at night.

roadwork