MARTA will be doing subsurface testing in downtown Decatur around the intersection of Church St. and Sycamore St. from Monday, April 6 – Saturday, April 11 between 9 a.m. and 4 p.m.
While cars will be able to travel in the area during this time, some on-street parking spaces will be unavailable.
A bit more detail about the work, from MARTA’s plans:
The field investigation that the MARTA Geotechnical Consulting Team (GCT) has proposed will consist of using dye testing, ground penetrating radar (GPR), hammer drills, probing, and remote camera inspection of sewers to investigate the subsurface beneath the pavement near the north and south edges of the MARTA subway box.